Quote Calculators
Quote Calculators · Renovations

Kitchen Renovation in Brisbane.Know what it should cost in Brisbane.

Tailored to the Brisbane, QLD market — local pricing adjustment applied automatically. A few quick questions, no obligation.

A typical kitchen renovation in Brisbane costs between $22,880 and $49,920 in 2026, with most projects landing around $33,280.

Last reviewed:

Newly finished kitchen renovation in a modern Australian home — example for Brisbane.
Step 1 of 8·Your location13%
Your location

Where is the project?

Enter your postcode so we can apply local pricing.

4-digit Australian postcode
Live estimate
$29,400 $43,850
Likely midpoint $35,950 · Brisbane
What you've configured
  • LocationBrisbane
  • How big is the kitchen?Standard (8–14 lm)
  • What's the scope of work?Full replacement, same layout
  • What finish level are you planning?Standard
  • Benchtop materialEngineered stone (porcelain / sintered)
  • When are you hoping to start?In 3–6 months
How the estimate works

What goes into the number.

We take a typical Australian kitchen renovation range and adjust by your location, kitchen size, scope, finish level, benchtop type and complexity. Optional inclusions are added on top as flat amounts.

  • Linear metres of cabinetry — the dominant cost driver.
  • Benchtop material and run length (stone joins add cost).
  • Whether you're keeping the existing layout — relocating gas, water and power adds significant labour.
  • Appliance package — integrated and induction are noticeably more expensive than freestanding.
  • Removing walls, especially load-bearing, requires engineering and structural work.
QLD

Kitchen Renovation in Brisbane.

Brisbane pricing is moderate by national standards but rising on the back of strong residential demand and pre-2032 construction pressure.

Frequently asked questions

How much does a kitchen renovation cost in Brisbane?

In Brisbane, a typical kitchen renovation costs between $22,880 and $49,920 in 2026, with most projects landing around $33,280. Pricing varies with size, finish level, complexity and your specific site.

How long does a kitchen renovation take?

Same-layout replacements typically take 3–4 weeks on site after cabinetry is built. Custom designs or open-plan conversions can take 6–10 weeks once trades, joinery and stone are scheduled.

What adds the most cost to a kitchen?

Custom cabinetry, stone benchtops with long uninterrupted runs, premium appliances and any structural / services relocation. A butler's pantry can easily add $6–10k.

Can I save money by keeping the existing layout?

Yes — keeping gas, water and electrical in place can save 10–15% on labour and avoid plaster, tiling and waterproofing remediation.

Should I budget for appliances separately?

Most builders quote install only and exclude appliances themselves. Budget separately for fridge, oven, cooktop, rangehood and dishwasher — typically $5–18k depending on brand.

See local pricing for your city

Each city page includes a local pricing adjustment, assumptions and FAQs.

Estimates only. Quote Calculators provides indicative pricing as a general guide for Australian homeowners. Final pricing depends on a site inspection, materials, access, labour availability and your project scope. Always obtain formal quotes before proceeding. See our disclaimer.